As part of their sub-contract, Glapwell will supply and manufacture the Top and Bottom assemblies for the new TSA vessels.
The Top and Bottom head assemblies are designed and constructed to ASME VIII Div. 1 Code stamped and supplied to extremely tight tolerances for a non-machined fabricated and welded product. |
|
|
|
PDF
|
|
| |
| |
| |
Bi-DIRECTIONAL & INSTRUMENTED SCRAPER TRAPS |
|
| |
The contractor was to renovate the existing 5" pipeline and also to build a new section of the EWG-1 pipeline which included the supply of 12 off new Bi-Directional & Instrumented Scraper Traps.
To read the full report please click the PDF icon.
|
|
|
|
PDF
|
|
| |
| |
|
| |
Design, supply and manufacture of 2500mmi/d Stainless Steel Sand Collection Vessel to ASME VIII Div.1 code stamped and Russian GGTN and GOST R certification.
|
|
|
|
|
|
| |
| |
| |
316L STAINLESS STEEL VESSEL |
|
| |
316L Stainless Steel Vertical Knock Out Drum to PD 5500.
Offshore project in UK for North sea including CE marking to Pressure Equipment Directive.
|
|
|
|
|
|
| |
| |
|
| |
Part of the expansion project was supply of a new Gas / Liquid Separator to go into the 36" NB 90Bar designed pipeline.
|
|
|
|
|
|
| |
| |
| |
REFURBISHMENT OF PIG TRAPS |
|
| |
Glapwell have recently completed the refurbishment of existing, operational onshore & offshore Pig Traps.
This involved the re-Non Destructive Testing, Wall thickness checks, removal of old Closure Door and the fitting of a new Closure Door.
Re-painting and testing to maintain Code compliance. |
|
|
|
|
|
| |
| |